by Dave C » Wed Apr 22, 2020 6:11 pm
Yes this building does have a full concrete floor.
However still undecided where to put the lathe. The rest of our metalworking equipment is in a building upfront, Bridgeport, lathe, drill press etc.
But no mater what we do that stuff will be on concrete.
Yes this building does have a full concrete floor.
However still undecided where to put the lathe. The rest of our metalworking equipment is in a building upfront, Bridgeport, lathe, drill press etc.
But no mater what we do that stuff will be on concrete.