Correct, cleaning the building upfront would be a great idea. But as said. too far to get a mower, rake, leaf blower etc.
Yes a concrete pad would be nice and easy and cheap... but i would think that would make the building permanent structure? and could subject us to wetlands review and permits?
Search found 89 matches
- Sat Mar 11, 2023 1:05 pm
- Forum: Project List 2023+2024
- Topic: lawn maintenance equipment shed
- Replies: 7
- Views: 11394
- Sat Mar 11, 2023 1:02 pm
- Forum: Project List 2023+2024
- Topic: Engine Building 1 Rehab List
- Replies: 2
- Views: 7617
Re: Engine Building 1 Rehab List
Conner, The existing light fixtures utilize a standard edison bulb. For which were using LED bulbs. For some reason they dont stand up well and are constantly burning out. If you look now %50 of the bulbs are dead. It may have something to do with the head getting trapped in those fixtures. I do lov...
- Sun Feb 26, 2023 2:29 pm
- Forum: Project List 2023+2024
- Topic: Engine Building 1 Rehab List
- Replies: 2
- Views: 7617
Engine Building 1 Rehab List
Project list for Engine Building 1, 5 year Renovations 25. Replace 2 incorrect boards outside next to East window with 1 correct board. 26: Repaint Outside 27: ClearCoat inside PREPWORK: Relocate all portable engines to Engine 2. Remove all items from existing shelfs. 1. Cut wall board for inside b...
- Mon Feb 20, 2023 7:29 pm
- Forum: Project List 2023+2024
- Topic: lawn maintenance equipment shed
- Replies: 7
- Views: 11394
Re: lawn maintenance equipment shed
I like the idea of a Shed for this type of thing, and i also have been invisioning a good place centrally located to keep, store and charge batterys. As doing this in the gas shed could have explosive results. As for a place. i guess we will need to scope it out sometime when were all at the farm. P...
- Sun Feb 05, 2023 4:07 pm
- Forum: Zagray Farm Members Talk
- Topic: Revised Standing rules 10,11,12 and 16 Adopted 1/31/2023
- Replies: 0
- Views: 16521
Revised Standing rules 10,11,12 and 16 Adopted 1/31/2023
Rule 10. When an item is offered to the Zagray Farm Museum as a donation, the offer must first be presented to the Board of Directors and the appropriate committee Chairman. The Board of Directors or Chairman may request pictures or have the item inspected to determine its acceptability as a donati...
- Sat Dec 31, 2022 2:11 pm
- Forum: Project List 2023+2024
- Topic: Project list Chester Barn Completion Items!!!
- Replies: 0
- Views: 15751
Project list Chester Barn Completion Items!!!
Chester Barn Punch List 1. Install Interior Siding on all walls in Main Building 2. Install OSB plywood on Walls in Support shed. (material onsite) 3. Install Conduit for Outlets in main building 4. Install Conduit for Lights , emergency lights in main building 5. Install Conduit for Outlets and li...
- Fri Dec 02, 2022 2:29 pm
- Forum: Project List 2023+2024
- Topic: Equipment Projects 2023-2024
- Replies: 1
- Views: 7172
Equipment Projects 2023-2024
Equipment maintenance/overhaul projects 2023-2024, in no particular order 1. New Holland skidsteer link - oil change 2. Case forklift link - alternator - steering cylinders and pump - check hydraulic leak under engine (pump seal) - inframe engine rebuild - fix oil leak at the back of trans/diff hous...
- Fri Dec 02, 2022 2:28 pm
- Forum: Project List 2023+2024
- Topic: Electrical Projects 2023-2024
- Replies: 0
- Views: 15815
Electrical Projects 2023-2024
Electrical "Tickets" for the next 2 years 1. Install Lights and Switches at front and rear doors of Tractor Barn 2. Install Complete electrical system in Chester Building (including a 220V outlet for a welder, please -CB) COMPLETED 3. Install RV outlets on post behind Engine 1/ Chester Building 4. ...
- Fri Dec 02, 2022 2:09 pm
- Forum: Project List 2023+2024
- Topic: Construction Projects out 2023 and 2024
- Replies: 0
- Views: 15806
Construction Projects out 2023 and 2024
Building projects, Maintenance Items, and New projects projected for the next 2 years in no particular order This post will be open to Directors to add, delete, modify etc 1. Build Tool room backside of Engine Building 1, Paint/Stain [font] COMPLETED [/font] 2. Replace Front Facia Board on Rear repa...
- Mon Aug 01, 2022 6:00 pm
- Forum: Work Party Information
- Topic: Work party Building prep. 7/30-31
- Replies: 3
- Views: 17526
Re: Work party Building prep. 7/30-31
[mention]Marc bezanson[/mention]
Blue lift is gonna move probbaly Friday to jobsite.... ITs been rented, and under contract for a few months!!
If you need it better use it fast!
Blue lift is gonna move probbaly Friday to jobsite.... ITs been rented, and under contract for a few months!!
If you need it better use it fast!