I'll probably complete topsoil on the area this weekend.
After that it will need rocks picked, landscape raking, and some hand work on the edges.
Looking for some help to complete and seed
landscaping septic area
Forum rules
1. Limit these jobs to one to two person jobs.
2. Jobs that can be accomplished in less then a day.
3. Once they are completed the Topic can be updated.
4. The author or a moderator can mark these with a "CHECK" as "SOLVED"
1. Limit these jobs to one to two person jobs.
2. Jobs that can be accomplished in less then a day.
3. Once they are completed the Topic can be updated.
4. The author or a moderator can mark these with a "CHECK" as "SOLVED"
-
- Member QVEA
- Reactions:
- Posts: 4
- Joined: Sun Apr 19, 2020 1:41 pm
- Location: moodus
- Name: tom smith
- Contact:
Re: landscaping septic area
Dave-- I reviewed the pavilion for handicapped access and the ramp is fine but it needs some road millings
at the end of the ram, and the engine building needs some also. Tractor building is ok.. I sent you a message but I don't know if it went out. Thanks
at the end of the ram, and the engine building needs some also. Tractor building is ok.. I sent you a message but I don't know if it went out. Thanks