New Repair shop!!
-
- Member QVEA
- Reactions:
- Posts: 16
- Joined: Wed Apr 08, 2020 3:02 pm
- Location: Southington, CT
- Name: Austin Primus
- Contact:
Re: New Repair shop!!
Little rusty from sitting outside. If you got three already you probably don't need this one but it can certainly be made available.
-
- Site Admin
- Reactions:
- Posts: 231
- Joined: Wed Mar 04, 2020 9:08 pm
- Location: Wallingford
- Name: David Chester
- Contact:
Re: New Repair shop!!
That looks like a vermont castings airtight
-
- Site Admin
- Reactions:
- Posts: 231
- Joined: Wed Mar 04, 2020 9:08 pm
- Location: Wallingford
- Name: David Chester
- Contact:
Re: New Repair shop!!
Workbenches installed...minus some trim work...also cabinet installed.
-
- Moderator
- Reactions:
- Posts: 25
- Joined: Tue Mar 31, 2020 2:31 pm
- Location: Harwinton
- Name: Joe M
- Contact:
Re: New Repair shop!!
Dave looks good thank you for all the hard work.
-
- Site Admin
- Reactions:
- Posts: 231
- Joined: Wed Mar 04, 2020 9:08 pm
- Location: Wallingford
- Name: David Chester
- Contact:
Re: New Repair shop!!
Thanks also to you [mention]JMotuzick[/mention] for donations of the stainless steel doors, cabinets, insulation etc etc. !
-
- Moderator
- Reactions:
- Posts: 25
- Joined: Tue Mar 31, 2020 2:31 pm
- Location: Harwinton
- Name: Joe M
- Contact:
Re: New Repair shop!!
It’s a group effort!
-
- Member QVEA
- Reactions:
- Posts: 4
- Joined: Sun Apr 19, 2020 1:41 pm
- Location: moodus
- Name: tom smith
- Contact:
Re: New Repair shop!!
Dave If you are going to put a milling machine or lathe in the building, they should be on a concrete pad
-
- Site Admin
- Reactions:
- Posts: 231
- Joined: Wed Mar 04, 2020 9:08 pm
- Location: Wallingford
- Name: David Chester
- Contact:
Re: New Repair shop!!
Yes this building does have a full concrete floor.
However still undecided where to put the lathe. The rest of our metalworking equipment is in a building upfront, Bridgeport, lathe, drill press etc.
But no mater what we do that stuff will be on concrete.
However still undecided where to put the lathe. The rest of our metalworking equipment is in a building upfront, Bridgeport, lathe, drill press etc.
But no mater what we do that stuff will be on concrete.