Work party Building prep. 7/30-31
Posted: Wed Jul 27, 2022 3:38 pm
To prepare for construction of our new engine building.
This coming weekend we will need the following accomplished
Bring all 8x8 and 6x6 posts to site. these are mostly located under the mill next to the rollers. These cannot be forked out. they will have to be brought out manually and loaded on forks to be brought over to the site.
Bring 24 foot long 2x12s to site. these are located next to the john deere mowing tractor under the north end of the rear overhang. again, they will have to be carried out manually. and loaded on forks and be brought over to the site.
Bring at least 1 stack of 16 foot 2x12s. these are located on backside of big tractor building. This will require the skidsteer, and 2 spotters. and very CAREfull manuvering. as the posts are 15 foot apart, and the beams are 16 foot wide.
All building material can be placed infront of building on blocking fo easy forking. Cover all material with tarps
Relocate cherry picker and scissor lift to jobsite.
Check all available propane tanks for cherry picker and refill as required.
Locate spreader bar used to lift beams intoplace with crane. deliver to jobsite.
This coming weekend we will need the following accomplished
Bring all 8x8 and 6x6 posts to site. these are mostly located under the mill next to the rollers. These cannot be forked out. they will have to be brought out manually and loaded on forks to be brought over to the site.
Bring 24 foot long 2x12s to site. these are located next to the john deere mowing tractor under the north end of the rear overhang. again, they will have to be carried out manually. and loaded on forks and be brought over to the site.
Bring at least 1 stack of 16 foot 2x12s. these are located on backside of big tractor building. This will require the skidsteer, and 2 spotters. and very CAREfull manuvering. as the posts are 15 foot apart, and the beams are 16 foot wide.
All building material can be placed infront of building on blocking fo easy forking. Cover all material with tarps
Relocate cherry picker and scissor lift to jobsite.
Check all available propane tanks for cherry picker and refill as required.
Locate spreader bar used to lift beams intoplace with crane. deliver to jobsite.