Work party Building prep. 7/30-31

Here you will find information on work parties scheduled at the farm. Pictures after the party may also be included.
Forum rules
Please post your work party description and full date and time of the event as topic name.
ie: Barn cleanup Saturday April 15th 2019 starting 9am.
Post the rest of the details in the post body. like lunch will be provided. etc
Post Reply
Dave C
Site Admin
Reactions:
Posts: 230
Joined: Wed Mar 04, 2020 9:08 pm
Location: Wallingford
Name: David Chester
Contact:

Work party Building prep. 7/30-31

Post by Dave C »

To prepare for construction of our new engine building.
This coming weekend we will need the following accomplished

Bring all 8x8 and 6x6 posts to site. these are mostly located under the mill next to the rollers. These cannot be forked out. they will have to be brought out manually and loaded on forks to be brought over to the site.

Bring 24 foot long 2x12s to site. these are located next to the john deere mowing tractor under the north end of the rear overhang. again, they will have to be carried out manually. and loaded on forks and be brought over to the site.

Bring at least 1 stack of 16 foot 2x12s. these are located on backside of big tractor building. This will require the skidsteer, and 2 spotters. and very CAREfull manuvering. as the posts are 15 foot apart, and the beams are 16 foot wide.

All building material can be placed infront of building on blocking fo easy forking. Cover all material with tarps

Relocate cherry picker and scissor lift to jobsite.

Check all available propane tanks for cherry picker and refill as required.

Locate spreader bar used to lift beams intoplace with crane. deliver to jobsite.

Marc bezanson
Director
Reactions:
Posts: 86
Joined: Thu Apr 09, 2020 2:03 pm
Location: Salem
Contact:

Re: Work party Building prep. 7/30-31

Post by Marc bezanson »

I’m hurting pretty bad right now, I’ll try to help out as needed. Can we leave the blue lift in tractor barn a bit longer? I have been sitting on a few things as it wasn’t working then the show came up fast on me.

artc
Treasurer
Reactions:
Posts: 178
Joined: Fri Apr 03, 2020 5:35 pm
Location: Middletown, Ct
Contact:

Re: Work party Building prep. 7/30-31

Post by artc »

We'll need a compressor or two under the roof of engine 1 building for construction . Hoses as well.

Dave C
Site Admin
Reactions:
Posts: 230
Joined: Wed Mar 04, 2020 9:08 pm
Location: Wallingford
Name: David Chester
Contact:

Re: Work party Building prep. 7/30-31

Post by Dave C »

[mention]Marc bezanson[/mention]
Blue lift is gonna move probbaly Friday to jobsite.... ITs been rented, and under contract for a few months!!
If you need it better use it fast!